TABLES FOR REPORTING MAINTENANCE DATA
Latest available carriageway and footway condition data from 2004/5 surveys
|
Indicator |
Best Value |
Value |
|
Principal Road Condition |
BV 96 |
30.6 |
|
Non-principal classified road condition |
BV 97a |
8.09 |
|
Non-principal unclassified road condition |
BV 97b |
12.94 |
|
Categories 1 & 2 footway condition |
BV 187 |
42.64 |
The BV indicators show the proportion of the network that should be considered for structural treatment.
Latest bridge data
|
No. of bridges |
No. of bridges requiring |
Total no. of bridges |
|
234 |
59 |
1,447 |
|
Length of retaining walls |
Length of retaining walls |
Total length |
|
31,990 |
11,523 |
392,900 |
Latest Strengthening and Major Maintenance Data for Bridges and Retaining Walls on the "nationally recognised" Primary Route Network (PRN)
|
Structure Name |
Primary Route |
Indicate Strengthening, |
Cost |
Date |
|
Primet |
A56 |
Strengthening |
90,000 |
2006/07 |
|
Kelbrook New |
A56 |
Strengthening |
70,000 |
2006/07 |
|
Tarnbrick Railway |
A583 |
Strengthening |
90,000 |
2006/07 |
|
Rosegrove Lane Railway |
A646 |
Strengthening |
250,000 |
2007/08 |
|
Lea Hall |
A583 |
Major maintenance |
95,000 |
2006/07 |
|
Billington |
A59 |
Major maintenance |
90,000 |
2006/07 |
|
Rose Cottage |
A59 |
Major maintenance |
50,000 |
2006/07 |
|
Downham Road |
A59 |
Major maintenance |
110,000 |
2006/07 |
|
Brockholes |
A59 |
Major maintenance |
400,000 |
2006/07 |
|
Hornby |
A683 |
Major maintenance |
150,000 |
2006/07 |